| Lymon C. Reese & Associates Projects in Geotechnical Engineering | 
Analysis of Railroad Derailment in West Texas
Project Location: West of Van Horn, Texas
Client:  Parsons Engineering Science - Union Pacific Railroad
Dates:  July 2002 to October 2002
Evaluation of Existing Foundations of Two 138-kV Transmission Towers
Project Location: Holly Street Power Plant & Pleasant Valley Rd, Austin, Texas
Client:  Duke Engineering & Services - Austin Energy, Austin, Texas
Dates:  January 2002 to May 2002
Evaluation of Deep Foundations for 345kV Transmission Towers
Project Location: Austin-Bastrop, Texas
Client:  ABB Sistemas, S.A. de C.V., Nuevo León, México
Dates:  February 2001 to March 2001
Geotechnical Investigation and Pavement Design for Lamar Boulevard
Project Location: Austin, Texas
Client:  Environmental Science & Engineering, Austin, Texas
Dates:  February 2001
Geotechnical Investigation and Pavement Design for East Riverside Drive
Project Location: Austin, Texas
Client:  Environmental Science & Engineering, Austin, Texas
Dates:  April 2000
Study of Structural Well Casings for Offshore Risers
Project Location: Austin, Texas
Client:  Marathon Oil Company, Houston, Texas
Dates:  December 1999 to February 2000
Development of Drilled Shaft Foundation Manual for the U. S. Army Corps of Engineers
Project Location: Austin, Texas - Washington, D.C.
Client: AWK Consulting Engineers, Inc. & U.S. Army Corps of Engineers
Dates: May 1998 to present (in progress)
Foundation Design for Bridges over Slaughter Creek on South First St. Extension Project
Project Location: Austin, Texas
Client: Dept. of Public Work and Transportation, City of Austin, Texas
Dates: June 1998 to August 1999
Foundation Design for ARCO Dock Completion Project
Project Location: Cherry Point, Bellingham, State of Washington
Client: ARCO and ANVIL Corporation; Bellingham, Washington
Dates: May 1997 to February 1998
Investigation of Slope Stability at Robert E. Lee Road
Project Location: Robert E. Lee Rd. and Barton Springs Rd., Austin, Texas
Client: Dept. of Public Work and Transportation, City of Austin, Texas
Dates: August 1997
Geotechnical Investigations for Wastewater Improvements in the City of Austin
Project Location: Various locations in the City of Austin, Texas
Client: Dept. of Public Work and Transportation, City of Austin, Texas
Dates: May 1996 to August 1997
Geotechnical Engineering Review on South Carolina Aquarium
Project Location: South Carolina Aquarium, Charleston, SC
Client: City of Charleston, South Carolina; Rhodes/Dahl, Charleston, South Carolina
Dates: May 1997 to August 1997
Strengthening Design for Transformer Foundation at Litton Springs Substation
Project Location: Litton Springs, Texas
Client: Austin Electric Utility Department; Austin, Texas
Dates: February 1997 to March 1997
Design of Foundation Structure for Brodie Lane Substation
Project Location: Austin, Texas
Client: Austin Electric Utility Department; Austin, Texas
Dates: May 1996 to September 1996
Design Investigation of Concrete Cracks on Foundations for Transmission Power Lines
Project Location: Austin, Texas
Client: Power Engineers, Inc.; Boise, Idaho
Dates: September 1995 to December 1995
Prediction of Differential Settlement of Clay Cap in Houston
Project Location: Houston, Texas
Client: Woodward Clyde; Houston, Texas
Dates: 1995
Preliminary Design of Piles for Retaining Walls at U. S. 290 and 7th Street
Project Location: Oakland, California
Client: Brown & Root; Houston, Texas
Dates: 1994-95
Preliminary Design of Foundation System for Crane Towers in the Port of Los Angeles
Project Location: Los Angeles, California
Client: Brown & Root; Houston, Texas
Dates: 1994-95
Design of Footing Cap and Replacement Piles for Fair Park Bridge
Project Location: Dallas, Texas
Client: Drillers, Inc.; Houston, Texas
Dates: 1994
Study of Placement of Conductors at MC-109 and Comments on Placement at VK-989
Project Location: BP Exploration Projects in the North Sea
Client: British Petroleum; Houston, Texas
Dates: August 1992
Analysis of Grouted Connections for Goodwin A
Project Location: North West Shelf Development Project, Western Australia
Client: Woodside Offshore Petroleum Pty. Ltd.; Western Australia
Dates: 1990
Analysis of Grouted Connections for Goodwin A
Project Location: North West Shelf Development Project, Western Australia
Client: Woodside Offshore Petroleum Pty. Ltd.; Western Australia
Dates: 1990
Engineering Report on Soil Borings and Analyses for the Safaniya Gosp-4 Complex
Project Location: Arabian Gulf
Client: Rashid Geotechnical and Material Engineers
Dates: 1990
Review of Design of Pile Foundations for the Pyramid Arena Building
Project Location: Memphis, Tennessee
Client: Reuss & Associates; Clearwater, Florida
Dates: 1989
Analysis of Stability of Lock Structures in the Mississippi River
Project Location: Mississippi River, Mississippi
Client: U.S. Corps of Engineers; Vicksburg, Mississippi
Dates: 1988
Analysis of Driven Piles under Downdrag in Shanghai
Project Location: Shanghai, China
Client: U.Sargent & Lundy Engineers; Chicago, Illinois
Dates: 1988
Analysis of Piles for North Rankin “A” Platform
Project Location: North West Shelf Development Project, Western Australia
Client: Woodside Offshore Petroleum Pty. Ltd.; Western Australia
Dates: 1987