Lymon C. Reese & Associates
Projects in Structural Engineering


Project Location:Ensenada, State of Baja California, México
Client: Astilleros Rodríguez, S.A.
Dates: 1980

Shipyard for fishing boats construction and repairing with Syncrolift vertical transfer system. Includes the design of reclaimed landfill, jetties, ship tracks elastic foundations, Syncrolift piers, mechanical installations and workshops. The tracks foundation and the Syncrolift dual piers structures were designed to comply with very strict tolerances for settlements and ship lifting p-delta effects, respectively. Complete drawings, specifications and a final report were delivered to the client. On the site consulting during the construction period was provided.


Send comments, notes, additions, corrections, etc. about this page to ENSOFT, INC.'s webmaster:  webmaster@ensoftinc.com
Page last updated June, 24 2000.